Mining projects demand agility in complex environments, tight schedules, live plant tie-ins, remote locations, and high-risk interfaces. For over four decades, Aurex Constructors has delivered large-scale, multi-discipline projects for leading mining operations across Southern Africa.
Our integrated SMEIPP model, in-house fabrication capability, and disciplined project controls give our customers one accountable partner.
Trusted by
Our services across the mining value chain
Project delivery and construction
Structural: Structural steel supply, fabrication and installation.
Mechanical: Mechanical equipment installation and precision alignment.
Piping and platework: Supply, fabrication, and installation for process and utilities.
Electrical: LV/MV power distribution, MCCs, cable racking, lighting, earthing.
Instrumentation and controls: Field instruments, control systems, calibration, loop checks.
Materials handling infrastructure: Conveyors, transfer stations, tackers/reclaimers, chutes, bins, silos, and load-out facilities.
Processing plants: Crushing, screening, milling, flotation, leach circuits, thickeners, filtration, tailings handling, utilities, and offsites.
Non-process infrastructure: Workshops, substations, water treatment, compressed air, utilities tie-ins, access ways.
Procurement and Logistics
Planning and execution: Critical-path isolation, scaffold strategy, multi-discipline work packs, and rapid recommissioning.
Condition-based maintenance: Non-destructive testing (NDT), thickness and weld integrity checks, rotating equipment alignment, and laser metrology.
Construction
Construction support: Civils, cranage, scaffolding, insulation, sandblasting and corrosion protection, and NDT, under unified supervision.
Commissioning and completions: Pre-commissioning, dynamic testing, systemisation, turnover dossiers, and start-up assistance through to handover.
Why Mining Houses Choose Aurex
Integrated delivery
Complete SMEIPP solutions under one accountable partner.
Regional Strength
Registered entities and teams acrossSouthern Africa, for rapid, complaint mobilisaiton.
Safety Leadership
Zero Harm commitment with zero fatalities and industry-leading safety performance.
Quality Assured
ISO-certified systems for guaranteed quality.
Our Successful Mining and Metallurgy Portfolio
Service: SMEIP Construction
XRT Sorter
Aurex Constructors was engaged by Sasol for the comprehensive execution of the XRT Sorter project, a critical infrastructure upgrade aimed at enhancing material handling and sorting capabilities within the plant. Our team meticulously managed key phases, including structural fabrication and equipment installation, demonstrating a commitment to mechanical excellence and operational foresight to ensure minimal disruption and seamless integration.
Our multi-faceted scope included the strategic Conveyor Belt tail extension to streamline material flow, the installation of a new platform for improved access and operational efficiency, and comprehensive structural fabrication to support the new infrastructure. The project’s success was underpinned by precise installation during shutdown and post-shut periods, a testament to our planning and execution capabilities. We also managed Phase 2 Equipment Procurement, ensuring all components met the highest standards for performance and reliability. Each element was delivered with precision, showcasing Aurex’s ability to manage complex SMP construction with accuracy and efficiency.
The XRT Sorter facility significantly improved Sasol’s operational efficiency by enhancing material handling and sorting processes. By executing the project during a critical shutdown and post-shutdown period, Aurex minimised downtime and reinforced the plant’s production capacity. This project exemplifies Aurex’s exceptional teamwork, which was the cornerstone of delivering excellence and strategic value to our clients.
Secunda, South Africa
Our Customer
Sasol
R14.5 million Contract Value
2025 Completion Date
Service: SMEIP Construction
Nacala Coal Export Terminal
Aurex Constructors led the delivery of the Nacala Coal Export Terminal, executing a large-scale Structural, Mechanical, Electrical, Instrumentation, and Piping (SMEIP) infrastructure project that elevated Mozambique’s role in global coal exports. Our scope encompassed the full design, construction, and integration of high-capacity systems tailored for bulk material handling and export logistics, demonstrating Aurex’s ability to manage complex terminal developments with precision and scale.
Aurex’s execution included the installation of a wagon tippler system for efficient rail-to-terminal unloading, construction of a high-capacity conveyor network with integrated transfer towers, delivery of stackers and reclaimers optimised for continuous bulk handling, installation of ship loaders and utility piping to ensure full export readiness, seamless integration of all systems into a cohesive, high-throughput operation. The project was delivered with strict adherence to safety, quality, and schedule, reinforcing Aurex’s reputation for excellence in high-impact infrastructure.
By enabling efficient, high-volume coal handling and streamlined export logistics, Aurex positioned Nacala as a strategic hub for international markets. The terminal supports Mozambique’s long-term export capacity and strengthens its footprint in the global energy supply chain. This project reflects Aurex’s commitment to building infrastructure that drives economic growth and operational resilience.
Mozambique
Our Customer

Vale Moçambique
$77 million USD Contract Value
2015 Completion Date
Service: SMEIP Construction
Moatize Coal Mine Interconnecting Conveyor
Aurex Constructors played a pivotal role in strengthening Vale Moçambique’s coal handling infrastructure at the Moatize Coal Mine, one of Africa’s largest and most strategically important coal operations. Tasked with delivering the moving head and interconnecting conveyors, Aurex ensured seamless integration into existing systems, enhancing operational continuity and reliability across the site.
Our multi-disciplinary execution included the full structural, mechanical, piping, electrical and instrumentation (SMEIP) installation, supported by extensive civil works and structural modifications to integrate the conveyors seamlessly into existing systems, precision alignment and commissioning ahead of moving head and conveyor assemblies. Completed with zero lost-time injuries, the project reflects Aurex’s unwavering commitment to safety, efficiency, and the delivery of infrastructure that sustains long-term productivity.
By reinforcing Vale’s coal handling systems, Aurex helped unlock greater throughput, reduce operational risk, and ensure robust performance to meet both domestic and international demand. The project reflects our ability to deliver infrastructure that meets technical specifications and sustains long-term productivity in high-pressure environments.
Mozambique
Our Customer

Vale Moçambique
$4.5 million USD Contract Value
2018 Completion Date
Service: SMEIP Construction
Balama Graphite Mine
Aurex Constructors played a central role in establishing one of the world’s most significant graphite operations for Syrah Resources at Balama, Mozambique. Tasked with delivering a fully integrated processing facility, Aurex enabled the customer to scale production and meet surging global demands for graphite, a critical material in energy storage and electric vehicle technologies. Project execution positioned the mine as a cornerstone of the international graphite supply chain.
Our scope included the construction of primary crushing, milling, and flotation facilities, supported by product dewatering, classification, and bagging systems. We further implemented a comprehensive tailings management system, integrated essential utilities, and delivered optimised storage and handling infrastructure. This large-scale project highlights Aurex’s expertise in executing technically complex developments that unlock long-term client value.
Balama, Mozambique
Our Customer

Syrah Resources
$24 million USD Contract Value
2017 Completion Date
Service: SMEIP Construction
Vale SMC-3 Erection
Aurex Constructors was entrusted with the full execution of the Semi Mobile Crusher (SMC-3) project for Vale Moçambique, delivering critical infrastructure that enhanced material processing in one of Africa’s most demanding mining environments. Our team led the erection, testing, and commissioning of the facility, bringing together mechanical precision, structural integrity, and operational foresight to ensure seamless performance under high-volume conditions.
Our multi-disciplinary scope included the installation of an apron feeder and chain roller system to support continuous material flow, the integration of a primary roll sizer with a hydraulic rock breaker for efficient size reduction, the implementation of an advanced dust suppression system tailored to environmental compliance, and the construction of an optimised conveyor system for streamlined material transfer. Each element was delivered with precision, reflecting Aurex’s ability to manage complex mining infrastructure with accuracy and efficiency.
The SMC-3 facility significantly improved Vale’s material handling efficiency and reinforced their production capacity. By minimising bottlenecks and enhancing throughput, Aurex helped unlock greater operational reliability and long-term performance for the plant. This project reflects our commitment to building infrastructure that meets technical demands and drives strategic value.
Mozambique
Our Customer

Vale Moçambique
$5.5 million USD Contract Value
2020 Completion Date
Service: Turnarounds/Shutdown
Carbo Tar, Coal Tar Filtration, and Methanol Purification and Integration Shutdown
During the 2024 shutdown at Sasol Synfuels, Aurex Constructors played a critical role in executing high-quality mechanical services across 3 essential units: Carbo Tar, Coal Tar Filtration (CTF), and Methanol Purification and Integration (MPI)). These units form an integral part of Sasol’s coal-to-liquid (CTL) and gas processing infrastructure, handling tar refining, coal-derived fuel purification, and methanol recovery.
As a trusted Shutdown contractor, Aurex ensured minimal disruption, technical excellence, and strict compliance with Sasol’s rigorous safety and operational standards.
- Carbo Tar: Focused on pressure vessel and static equipment inspections, ensuring continued efficiency in coal-derived tar processing and refining. Given the high-temperature and high-pressure conditions within this unit, maintenance interventions were critical to prevent operational failures and uphold environmental and safety regulations.
- Coal Tar Filtration (CTF): Essential for removing impurities from coal-derived liquids, ensuring the production of high-quality fuel and chemical feedstocks. Shutdown operations focused on hydraulic torquing, pressure testing, and filtration system optimisation to enhance purification efficiency and maintain compliance with emissions regulations.
- Methanol Purification and Integration (MPI): A key processing unit responsible for methanol recovery and purification, critical in Sasol’s synthetic fuel production. Maintenance efforts included tower tray repairs, pressure vessel inspections, and static equipment integrity verification to sustain safe handling and efficient methanol production.
With 75 work packs delivered, the shutdown required precision planning, real-time adaptability, and seamless execution within Sasol’s processing framework. Welding was excluded from the scope, highlighting the need for disciplined coordination and mechanical execution without high-temperature.
Executed on schedule and with minimal operational disruption, the shutdown directly contributed to safe plant operations,regulatory compliance, and extended equipment longevity. Aurex’s ability to navigate highly specialised refinery shutdowns under intense operational conditions reaffirmed its reputation as a leading partner in critical industrial maintenance.
By ensuring the continued efficiency of Carbo Tar, CTF, and MPI units, Aurex helped Sasol maintain high-performance refining capabilities, environmental compliance, and uninterrupted production, reinforcing the long-term reliability of South Africa’s synthetic fuels infrastructure.
Sasol Synfuels, Secunda, South Africa
Our Customer
Sasol
65,544 Man Hours
Aug - Sept 2024 Execution Period
Safety, Quality, and Community
Every Aurex project is grounded in our core values: Responsibility, teamwork, integrity, tenacity, and quality. We uphold the highest HSSE standards to ensure safe execution, while our ISO-certification systems and disciplined controls guarantee uncompromising quality.
We build trust by investing in local skills and partnering with host communities, creating shared value beyond the project site.
Our commitment is clear: safe execution, on time, to specification, and delivering lasting impact for our customers and stakeholders.
Ready to start?
Partner with Aurex for safe, on time delivery and lasting value.
Contact Us
News
Delivering Maintenance Milestones Year on Year
The ability to draw lessons from past projects and constantly improve has turned Aurex Constructors into the preferred contractor for maintenance shutdowns on mega petrochemical
Aurex Constructors reflects on a transformative 2025 and looks ahead with confidence
Leading industrial construction, turnaround, and maintenance company Aurex Constructors has closed out 2025 on a strong footing, navigating shifting market conditions while delivering record progress

Aurex Constructors strengthens strategic focus on mining infrastructure delivery
27 October 2025: With decades of experience in delivering complex industrial projects, Aurex Constructors continues to meet the evolving demands of a sector that remains